Disposal of Bulky Waste & Demolition Debris

The Pinetree Transfer Station will be accepting Bangor residential bulky waste and demolition debris on the following schedule and under the following conditions.

Directions to Pine Tree Transfer Station 

I-95 South to exit 180 (Hermon, Hampden) turn right onto the Coldbrook Road from the exit ramp, take the first left onto the Emerson Mill Road, (Dysarts is on the left), cross the railroad tracks, pass under I-95, Pine Tree Landfill will be on the left. (see map below)

Hours of Operation

Monday through Friday 
7:30 am to 5:00 pm

Saturday 
7:30 am to 12:00 pm

Sunday 
Closed

Instructions

  1. All loads must be secured with tarps or coverings and tied in place
  2. Entering and leaving, residents must drive onto the scales (center lane) to weigh in and out and must pay the tipping fee
  3. At the railroad track, entering and leaving traffic must stop, look both ways, listen for train whistle before crossing
  4. After crossing the railroad track, follow the signs to the appropriate dumping area
  5. Please! Children must remain in vehicle
  6. No dump picking is allowed

Acceptable Materials

  • Appliances containing CFC gasses, e.g. air conditioners, refrigerators, etc.
  • Asphalt Shingles
  • Cardboard
  • Clean Wood
  • Construction and Demolition Debris
  • Metal
  • Oversized Bulky Waste
  • Universal Waste, e.g. fluorescent light bulbs, non-lithium batteries, CRT televisions, etc.
  • Tires

Note: Universal Wastes are accepted at the onsite consolidation facility and can be dropped off at the scale house for a fee.

Unacceptable Materials

  • Any material as a "Hazardous" Waste
  • Paints
  • Chemicals
  • Any liquid waste
  • Waste oil
  • Medical-related waste
  • Pathological waste
  • Dead animals
  • Abandoned or junk vehicles
  • Tree stumps
  • Telephone poles greater than 6 feet long
  • Railroad ties greater than 6 feet long
  • Metal panels greater than 8 feet long
  • Friable/non-friable asbestos materials
  • Pesticides
  • Sealed drums
  • Pressurized gas cylinders and tanks (partially full or empty), or propane tanks
  • Hot ashes/any ash material
  • Odiferous waste
  • Wastewater sludge
  • Front-end process residue (FEPR)
  • Any waste material not receiving prior approval from Environmental Compliance Manager