1.
Consent
Agenda
A motion made and seconded to approve the Consent Agena items. Gratwick asked about the $3,500 stipulation in Item a), and Cyr said it is arranged through the closing attorneys.
a.
Lien Payment and Quitclaim Deed – Cousins – 85 & 87
b.
Quitclaim Deed – Goodwin – 450
2.
Bids/Purchasing
a. Front End Loader – Fleet Maintenance – Nortrax - $168,500
Cyr said this is part of the annual fleet maintenance replacement. The loader to be replaced is five years old and is being sold back, in a similar fashion as to what is being proposed for the new item. 5 bids were received and the recommendation is to the low responsive bidder, Nortrax of Hermon, for a life cycle cost of $93,500. The actual cost is $168,500 but the City asks for a guaranteed maximum total of the City’s repair costs over the five year period. The City will be responsible for none. The guaranteed buyback price by Nortrax at the end of the five-year period is $75,000. Beauregard Equipment had a lower net cost but it did not meet bid specifications. Blanchette spoke about the buyback practice and the fact that it saves taxpayer money. A motion was made and seconded to approve recommendation to the full Council.
b. Toner Cartridges – City Wide – WB Mason - $50,000 approx.
Cyr noted that this item had been
previously discussed at a Finance Committee meeting with a recommendation of
award to The Tree House, Inc.
Subsequently, staff found that The Tree House was not able to honor
their original pricing as the pricing proposed was not per item. Based upon the revised pricing, staff redid
the bid tabulations and WB Mason of
c. ¾ Ton 4x4 Utility Vehicle – Fire Department – O’Connor - $35,344
Cyr said this is referred to as the Command Vehicle and response to all calls. The replacement is part of the Fire Department replacement plan. The 2007 Homeland Security money was targeted for this replacement. 3 bids were received and the recommendation is O’Connor, the low bidder. It is important to note that additional expenses estimated at $9,000 will be incurred to put the vehicle into service. The appropriated amount for this purchase was $45,000. Responding to Blanchette, Cammack said the unit to be replaced is 10 years old, and it will be moved to the SRT Team. In response to Gratwick, Cammack said other state departments use the same type of vehicles because of the amount and size of needed equipment. In prior years, this equipment was not available. The older vehicle has 60,000 miles but it idles a lot and the hours used are looked at more so than the actual mileage. Blanchette noted that times and needs change over the years in terms of necessary equipment. A motion was made and seconded to approve staff’s recommendation.
d. Rehab Engine 2 – Fire Department – Green’s Auto Body – up to $20,000
Cyr noted that the City has three front line engines and one reserve engine, which is a 1989 Pierce Arrow. The equipment needs extensive rust and corrosion repair work. This was anticipated in FY08 and funding was appropriated. Three quotes have been obtained. Staff recommends a contract with Green’s Auto Body at slightly over $11,000. Cyr noted that Green’s is owned by the family of a recently retired long-term firefighter. Staff asked for approval to go up to $20,000 in case other issues are found during the repair work. $34,000 is available within the budget. A motion was made and seconded to approve staff’s recommendation. In response to Farrington, Cammack said the price difference in the three quotes was in the hourly labor rates. Responding to Palmer, Cammack said the repairs should extend the life of the equipment another 10-15 years.
e. Request
to Waive Bid Requirements – Public Works – Intersection Equipment for Broadway
and
Cyr stated that this is for traffic control equipment. This is part of a BACTS project 90% funded by the state and 10% by the City. The needed equipment is an Econolite controller, which is needed for compatibility on the Broadway stretch. Econolite is a sole source vendor for the equipment. Staff asked the Committee to waive the bid process in order to purchase the controller for $13,743. The second piece of equipment for this intersection is a Traficomm detection unit. Highway Tech is the sole vendor for this equipment and staff requested permission to waive the bid process to purchase the equipment for $11,400. Traficomm is compatible with Econolite. Responding to Gratwick, Wardwell said that most intersections have some sort of traffic detection equipment either overhead or loop underground. The latter is not as long lasting. Traficomm has been available for the past couple of years. It has been very successful at the Odlin-I395 intersection. Blanchette asked about the sequence of the light at Ohio/Griffin. Wardwell said the system is on detection. When the amount of traffic volume changes, the equipment sometimes might take a couple of cycles to catch up. A motion was made and seconded to approve staff’s recommendation.
f. Request to Waive Bid Requirements – City Wide – Stormwater Utility Study – CH2M Hill
Cyr said this relates to the City’s watershed management plan which requires certain actions on the part of the City. Part of the discussion during the FY09 budget process was the staff’s recommendation to set up a Stormwater Utility District to fairly assess for impervious surface in order to pay for costs associated with costs incurred due to Maine DEP compliance regulations. The City secured a $10,000 Maine DEP grant. Staff asked for approval to waive the bid process and to work with CH2M-Hill regarding the feasibility of setting up a Stormwater Utility District. CH2M-Hill did a similar study for the City’s CSO, and they are familiar with the City’s infrastructure and its billing system. The City’s match to the $10,000 grant will be in the form of staff hours. Gratwick asked if this relates to a specific policy. Barrett said the grant itself specified Birch Stream but will also look at transferring it to the City as a whole. Gratwick asked if the stakeholders are being included upfront. Regarding the Penjajawoc Stream, Barrett said the City was under strict DEP guidelines which required a shorter stakeholder involvement process than preferred. The initial stakeholder process led to raising the awareness of stakeholders that they needed to be more involved. This current process won’t be under a tight timeframe and he sees it as a beginning step towards moving to some sort of a drainage utility. Stakeholders will be involved and this is simply the first preliminary exploratory step that will help identify all issues to be addressed. Gratwick asked about the expected timeframe. Barrett said there will be a period of time when CH2M-Hill will perform the study. Ring said staff will provide information and the actual working time of CH2M-Hill should be two or three months involving staff and stakeholders. Barrett said at that point there will be a full public policy process which might take six months at a minimum. To implement a Stormwater Utility District, it will take 12-18 months or longer, Barrett said. A motion was made and seconded to approve staff’s recommendation.
3.
Taxpayer
Request – Lower Delinquent Interest Rate
Cyr said staff was approached by a
taxpayer questioning why the City would set its interest rate on delinquent
taxes at 11%. Historically, the City has
always followed the maximum tax rate set by the State Treasurer. Mr. Gray asked the City to reconsider the
amount in order to assist taxpayers during this difficult year. Dave Little surveyed 42 municipalities; 12 smaller municipalities
have a lower rate than the state estimated maximum; municipalities with a
similar size to
4.
Taxpayer
Request – Refund of Excise Tax
Little said that Mark Kitchen
requested that the City refund him a portion of paid excise tax on a vehicle
which he no longer owns. He was informed
that under State Law there is not a refund provision. A portion of the unused paid excise tax is
credited toward a new registration within the same registration year. Kitchen asked for his request to be
considered by the City Council. Little
explained to Kitchen that the Council has no authority to refund excise taxes
due to the State Law. If approved by the
Committee, the City would cut a check to Kitchen but staff does not recommend
this avenue. Palmer suggested that the
City’s policy should be posted in the Treasurer’s Department, and Little
agreed. Blanchette expressed concern
about a clutter overload of information on display. She feels it is not the City’s responsibility
to post every State Law. Palmer feels it is important for the consumer to
understand laws and for the City to be user-friendly. A motion was made and
seconded to move staff recommendation.
5.
Update
on Fire Station 6 Project
Cyr provided background
information. In 2005, the City
authorized a $1.5M bond issue. At that
time there were deficiencies at the existing Station 6 and the City was hoping
to work with
Discussion continued, and Gratwick
spoke about the need for a quality product and the
6.
Request
to Tax Possession of Mobile Home
Cyr noted that the item is to take
possession of a mobile home. David Little said that the owners have abandoned this mobile home. Code Enforcement has verified that the mobile
home is both empty and uninhabitable.
Given that the property has several matured liens, it is considered tax
acquired and, after vacated for 60 days, the City becomes responsible for
insuring the property and liable for any injuries or damages associated with
it. This 60 day period will be up at the
end of this month. A motion was made and
seconded to recommend approval of a Council Order which will authorize staff to
take possession and dispose of the mobile home.
A third party will be hired for the disposition. The item will appear on the upcoming
Council’s agenda for final action.
7.
Discussion
of
Barrett discussed the memo which he had prepared for the Committee’s agenda packet dealing with the wood chip and natural gas heating alternatives.
Palmer spoke about the risks and expenses of the wood boiler that he didn’t see outlined in the prepared material. A building is needed for a wood chip boiler. One would be inside of a hangar. He spoke about maintenance needs, safety issues, staff time, and ash removal. For both the Airport and High School, trucks will need to deliver the product and not interfere with the operations of both facilities. He spoke about exhaust from the trucks.
Blanchette said the discussion is for the Airport boiler, not the high school. She has a problem with the City becoming dependent on another source empowering the company to set the prices. She thought trying wood at the Airport would be a better start because they deal with large vehicles anyway. She asked the Chair to focus the discussion on the Airport only.
Barrett spoke about the cost of natural gas being like electricity. There are two parts: the price of the commodity (deregulated) and the price of the delivery charge (regulated by the PUC).
Farrington noted that former Councilor Cashwell differed with the $55/ton vs. $80/ton. He asked how that would increase the cost of the figures. Barrett said that part of Cashwell’s concern is that he is aware of mills in the state that are paying $80/ton. He is concerned that if that is the case and if they are in fact shipping wood as far as over 100 miles to various mills that the City would be a very small user, that signing a contract for $40 and a mill paying $80 that the City might have great difficulties to get someone to continue to provide the price. Bob Marcotte spoke about potential paybacks.
Hupp said it is a difficult decision, and there isn’t a clear right or wrong answer in this situation. She would rather invest her personal money today if she knew the payback would be within 3-5 years as opposed to a longer time period. She feels that natural gas would provide a return in a relatively short period of time with improved efficiencies and cost savings. She would take a wait and see approach with the wood.
Blanchette said she doesn’t have a preference between gas or wood. She stated that she was not comfortable with deregulation of utilities.
Barrett said the oil market is totally deregulated. The wood market would be similar. With natural gas, the commodity pricing depends on supply and demand. The delivery charge for both gas and electricity has tended to be much less variable than the commodity charge.
Jerry Livengood
of Bangor Gas agreed there are a lot of uncertainties. He spoke about the difference with
deregulation of electricity than of natural gas. It’s worked for natural gas because it can be
stored whereas electricity is generated on demand. Bangor Gas’ rate is 20% of
the actual total delivery cost, and it can be locked in. Economic development coming into
Jim Lucy discussed his philosophy on wood and said that Honeywell is not trying to steer the City in either direction. When Honeywell did their energy audit of some forty City buildings, the two largest load sites found viable for wood burning were Bangor High and the Airport. Lucy cautioned the Committee to look at fuel choice – gas or oil or wood in the mix – because history shows that the prices flip flop. Honeywell has recommended natural gas for ten sites.
Gratwick spoke about the longevity of the boiler. Lucy said it is a regular standard boiler with a different fuel delivery system with a recommended 25 year life cycle. Many exceed that amount of time. Marcotte said the proposed system has been around in excess of 20 years in the tri-state area with 50-60 installations.
Responding to Gratwick, Barrett said at some point the Council needs to make a decision on which direction to move forward. Although not necessarily tonight, a decision by the Council sooner would be better than later. Farrington suggested that the Committee needs to decide if it is competent to make a recommendation to the entire Council and, if not, possibly schedule a Council Workshop involving the entire Council. Gratwick favored the wood option for the Airport but said that diversity is necessary throughout the City. Palmer said he needs more time and education before making a decision. He spoke about the easy delivery of natural gas and its cleanliness.
D’Errico asked if the Airport Sheraton is on the natural gas system. Marcotte said the service line is in place and only needs to be connected. Hupp said that GE also recently converted to natural gas.
John Kunz of Bangor Gas said that
diversification is good and he looks toward wind power. He said that
Blanchette said she has spoken
with the Finance Director regarding the pay off for a 2 year investment for
natural gas at the Airport. She would
like to discuss a lock in price with Bangor Gas. She said the City can’t afford to wait to
have further meetings. A decision needs
to be made. She made a motion to put
before the Council the option of going to natural gas at
Dave Shipley, VP for Energy West,
who purchased Bangor Gas in December, spoke about natural gas for the City and
its commitment to
Gratwick said the Committee is making a decision to move this forward to the next Council meeting. He would like to know when natural gas can go in, real costs to be amortized overtime, and maintenance costs for a wood furnace. Gratwick said he is not ready to vote at this time due to more information needed. Coombs said the gas is available and it only needs to be extended from the access road to the boiler room. It could be done within two weeks. Additional time would be needed for the four hangars.
Palmer said a course of action is needed. If the Committee recommends, the item would be on Monday night’s Council agenda. Barrett noted that Council Chair Hawes will be out of town on Monday. He said he would be willing to put together more information for the Council prior to Monday. He also noted that he will be out of town on Monday at an annual conference.
Blanchette again stated that the item needs to be on the Council’s agenda. If a quorum lacks at that meeting, it can be moved to a date certain.
Farrington called for a vote on the motion. It was 4 approving and 1 opposed.